Installing eco-mortar on the staris 1. Remove old tiles from the stairs 2. Protection non-slip parts before work 3. Plastering mortar on vertical part at 4~5mm 4. Leveling mortar up to the edge of non-slip parts 5. Grinding the surface to remove laitance & dust and improve bonding strength 6. Setting SM COAT FC, hybrid non flammable finish coating mixed with ceramic balls for non-slip
|
||